SCODE Push-n-Pull stove
SCODE Push-n-Pull stove

A natural draft micro gasifier stove with turboprop technology that burns any kind of biomass efficiently with little smoke. With self propulsion capability resulting in a powerful draft, it can utilize all fuels fed from the side including charcoal, pellets, briquettes, etc.

IWA tiers of performance
Show subtiers
unrated
Emissions
unrated
Efficiency
unrated
Indoor emissions
unrated
Safety
Information for consumers
Maximum pot capacity
30 L
Approximate lifetime
6 years
People fed per meal
1-60
Pot type accommodated
(Flat bottom/Round bottom)
Both
Countries deployed
Kenya
Common foods cooked
Those to be boiled, fried, and baked
Manufacturer's warranty available?
Yes
Warranty details
1 Year
General information
Manufactured in
Kenya
Suggested retail price
USD 35-50
Availability
On the market
Dimensions (l/w/h)
350/300/400 mm
Weight
16.0 kg
Shipping dimensions
400/350/450 mm
Shipping weight
20.0 kg
Local assembly possible?
Yes
Materials needed for local assembly
G16- SS metal sheet, G18-MS metal sheet, fiber glass, flat-bar metal strips
Includes instructions?
No
Other information
Based on turboprop technology (self propelling). Patenting in progress and production still in the range of a few units per week.
Characteristics
Non-traditional, Household, Institutional, Portable, Side-feed
Fuels
Briquettes, Charcoal, Coal, Crop residues, Dung, Pellets, Wood
Materials
Ceramic, Metal
Performance details
Efficiency, energy consumption and fuel use
Metric Min value Max value Number of tests
Cold start thermal efficiency 19.26 % 23.0 % 2
Hot start thermal efficiency 22.19 % 24.0 % 2
Simmer thermal efficiency 25.0 % 36.67 % 2
Specific fuel consumption cold start 70.45 g/L 95.43 g/L 2
Specific fuel consumption hot start 56.98 g/L 87.58 g/L 2
Burning rate hot start 19.597 g/min 28.32 g/min 2
Burning rate cold start 17.255 g/min 26.61 g/min 2
Burning rate simmer 6.167 g/min 11.94 g/min 2
Specific fuel consumption simmer 79.49 g/L 143.37 g/L 2
Output
Metric Min value Max value Number of tests
Mean time to boil 16.5 min 17.0 min 2
Time to boil cold start 18.0 min 19.67 min 2
Time to boil hot start 14.33 min 15.0 min 2
EPTP metrics
Metric Min value Max value Number of tests
Average fuel use 322.44 g 587.89 g 2